性欧美极品另类-性欧美极品-性欧美黑人xxxx-性欧美黑人-久久在精品线影院精品国产-久久曰视频

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Industry News

Safety inspection of simple building elevators

Source: Time:2017-12-26 09:31:23 views:

Simple building elevators are a type of vertical transportation machinery commonly used in construction enterprises. At present, due to the lack of a unified standard for the design and manufacturing of simple building elevators, there are more self manufactured ones.
Simple building elevators are a type of vertical transportation machinery commonly used in construction enterprises. At present, due to the lack of a unified standard for the design and manufacturing of simple building elevators, there are more self manufactured ones. Although some are produced by designated manufacturers, their safety and reliability are still poor. In addition, due to the fluidity and cross operation of construction, the dismantling, transportation, and installation of elevators can cause human damage and installation that does not meet safety requirements, resulting in the collapse of the frame, the falling of the hanging plate, the scattering of suspended objects, mechanical twisting and rolling, and electric shock accidents. Therefore, strengthening the safety inspection of simple building elevators, timely discovering hidden dangers and rectifying them, is an important measure to prevent injury accidents from occurring.

  The safety inspection items and requirements for simple building elevators include the following aspects: 1. Checking the foundation. Check if the foundation has sufficient strength. Is there a safety factor that can withstand twice the weight and load of the elevator. Whether the foundation soil is practical, the concrete should meet the standard, the foundation area should be 500mm larger than the circumference of the frame, and should be 200-300mm higher than the natural ground. Is the base installed with bolts. Have drainage ditches been set up on the basis. 2、 Check the frame. Start checking the frame during installation to ensure there is no detachment or cracking in the welding areas, and to check for any deformation or distortion in the rods. After the elevator is in operation, it should also be inspected. After the installation of the frame is completed, the bolts should be checked for tightness. Use a theodolite to check the verticality of the frame and the levelness of the slide. Is it within the allowable deviation range. Is the verticality of the guide rail and the deviation between the two guide rails less than 10mm. 3、 Check the hanging disc. Check whether the nodes of the components and the laying of the base plate are firm and flat, whether the automatic elevator door sill slides smoothly up and down, whether the rolling of the hanging disc in contact with the track is smooth, and whether the roller and track meet the requirements. 4、 Check the ground anchor. Ground anchors include cable wind rope ground anchors and winch ground anchors. Whether the anchor is buried in a flat and dry place, and whether there are trenches, underground pipelines, and underground cables within 2 meters around it. Whether the anchor material is selected according to regulations and rotten materials are not allowed to be used as anchors. During the load test, check whether the ground anchor has changed. During the operation of the elevator, it is necessary to regularly check whether the ground anchor is loose and whether it is feasible to connect with the cable wind rope. 5、 Check the winch. Whether the winch is installed on a site with a wide field of view and flat ground, and whether the distance between the winch and the frame meets the requirements; Is the winch fixed with ground anchors; Check if the winch is equipped with an operating shed that provides sun protection, rain protection, and prevents falling objects from heights. In addition, it is necessary to inspect the drum, coupling, and brake simultaneously. Is there any damage. 6、 Check electrical equipment. Whether to select electrical switches, wires, thermal components, fuses, etc. according to the capacity of the winch; Is the power box installed in a convenient location for operation, and are there door locks and rain protection facilities. Check the insulation condition of electrical circuits and equipment, whether reliable measures have been taken to connect to neutral and ground, and whether leakage protectors have been installed. Has a lightning protection grounding device been installed. Does the grounding resistance meet the requirements. 7、 Check safety devices and protective equipment. Simple elevator safety devices mainly include three types: suspended basket stopping device, suspended basket rope breaking device, and suspended basket height limit device. The safety protection facilities include the safety door of the loading platform on the suspended platform, the protective fence, the protective flat and vertical nets, and the protective shed. Before using a simple elevator, it is necessary to check whether the safety devices are complete and effective, whether the selection of safety protection facilities is reasonable, and whether the installation meets the requirements of the regulations. 8、 Conduct performance testing and inspection. After the inspection of the above items is completed and the problems found are resolved, a performance test inspection of the elevator should be carried out. The performance test inspection mainly includes three items: no-load test, static load test, and dynamic load test; Empty load test: Start the winch, lift and lower the basket three times each without load, and check whether the transmission parts, electrical equipment, safety devices, etc. are reliable. Static load test: First, conduct a rated load test, and then start with an overload of 5%, increasing by 5% each time until the overload reaches 50%. Lift the heavy object to the ground 100mm, hover for 10 minutes, and then lower the lifting plate. Check that the metal structure of the elevator is not deformed. The weld seam shall not be detached, the working mechanism shall have no abnormal phenomena, the brake shall be reliably braked, the cable wind rope and ground anchor shall not be loose, the elevator base shall not sink, and the verticality of the gantry shall be within the specified standard range. Dynamic storage test: Overloaded by 25%, the basket is lifted continuously, braked 3 times, then lowered continuously, and braked 3 times again, and all working mechanisms are checked. Is the special brake sensitive and reliable.

Links

久久久久人妻一区精品色国语 | www老牛黄色一区 | 欧美性猛交XXXX乱大交俱乐部 | 四川少妇搡BBB搡BBB爽爽爽小说 | 91人妻人人澡人人爽 | 亚洲ss在线观看区二区 | 欧美一级特黄AAAAA片大水 | 17.c 蜜桃视频 红桃视频 | 免费无码国产在线观看 | 天天躁日日躁AAAAXXXX-百度 | 28—20岁女人一级毛片 | 丰满人妻久久一区二区三区69 | 国产精品嫩模被猛烈进入灌浆 | 国产一区二区不卡老阿姨 | 日本老熟女毛绒绒 | www.亚洲高清视频 | 国产一区二区女内射 | 影音资源第二页中文高清版 | 久久亚洲熟妇熟女 | 18一20岁一级毛片 | 先锋影音av资源在线观看网站 | 国产真实亲子伦脏话对白免费影视 | 有码无码久久久久久999 | 日本少妇做爰高潮片 | 精品久久BBBBB精品人妻 | 丰满人妻熟妇乱又伦精品凤鸣阁 | 91人妻换人妻互换A片爽文 | 亚洲天堂免费视频 | 午夜成人黄色aaa电影在线免费观看 | 精品刮子伦一区二区三区在线播放吗 | 久久午夜无码鲁丝片午夜精品 | 日本黄色视频在线免费观看 | 结衣乳巨码无在线观看 | 日韩AV,东北熟女 | 91麻豆国产在线 | 亚洲乱码精品久久久久.. | 国产香焦视频不卡 | 在线免费观看黄色视频网站 | 男女无遮挡XX00动态图120秒 | 亚洲AV永久无码精品无码国产 | 国产成人在线免费视频 |