Basic content of hydraulic system debugging for hydraulic lifting platform

Source: Time:2020-01-10 09:03:21 views:

Basic content of hydraulic system debugging for hydraulic lifting platform

1、 Preparation work before scheduling hydraulic system

1. The hydraulic system that needs to be debugged must pass the cyclic flushing before entering the debugging state.

2. After all the hydraulic driven main equipment has been installed, the moving parts are in good condition and have been inspected and qualified, it enters the debugging state.

3. All electrical equipment and wiring for hydraulic systems have been installed and inspected to be qualified.

4. Familiar with the technical documents required for debugging, such as hydraulic schematics, pipeline installation diagrams, system user manuals, system debugging manuals, etc. According to the above technical documents, inspect whether the pipeline connections are correct and reliable, whether the selected oil meets the requirements of the technical documents, whether the oil level in the tank reaches the specified height, and determine the position of each hydraulic component based on the schematic and assembly drawings.

5. Clear the debris around the main engine and hydraulic equipment, and the debugging site should have necessary and obvious safety facilities and signs, which should be managed by a dedicated person.

6. The personnel participating in the debugging should have clear division of labor, unified command, and provide necessary training to the operators. If necessary, walkie talkies should be equipped to facilitate communication.

2、 Scheduling steps for hydraulic systems

1. Pre debugging inspection

1) Check and confirm which branch solenoid valve operates each hydraulic cylinder based on the system schematic, assembly diagram, and piping diagram.

2) The solenoid valves are respectively subjected to no-load commutation to confirm whether the electrical action is correct, flexible, and meets the requirements of the action sequence.

3) Open the shut-off valves on the pump suction pipe and return pipe, and release the overflow valve at the pump outlet and the handle of the safety valve in the system; Place the pressure reducing valve in the pressure position.

4) The flow control valve is placed in the small opening position.

5) According to the instructions, charge nitrogen into the accumulator.

2. Start the hydraulic pump

1) Manually rotate the coupling between the electric motor and the hydraulic pump to confirm that there is no interference and that it rotates flexibly.

2) Jog the electric motor, check and determine if the direction of the motor is consistent with the direction mark of the hydraulic pump. After confirmation, jog continuously several times. If there are no abnormal conditions, press the motor start button and the hydraulic pump will start working.

3. System exhaust

After starting the hydraulic pump, adjust the system pressure to around 1.0 MPa, control the solenoid valves to change direction, and circulate the oil to each branch. Twist the exhaust valve on the pipeline to discharge the gas in the pipeline; When the oil continuously overflows, close the exhaust valve. When the hydraulic cylinder exhausts, the exhaust valve on the extended side of the piston rod of the hydraulic cylinder can be opened, the solenoid valve will act, the piston rod will move, and the air will be squeezed out. When it reaches the top dead center, the exhaust valve will be closed. Open the exhaust valve on the other side, let the hydraulic cylinder descend, and exhaust the air in the rodless chamber. Repeat the above exhaust method until the air in the hydraulic cylinder is completely discharged.

4. System voltage withstand test

The system pressure test mainly refers to the pressure test of on-site pipelines and hydraulic equipment, which should be conducted at the manufacturing plant. For hydraulic pipelines, the pressure for the pressure test should be 1.5 times the working pressure. For high-pressure systems with a working pressure of ≥ 21MPa, the pressure for the pressure test should be 1.25 times the working pressure. If the hydraulic pump of the system can reach the pressure resistance value, it is not necessary to use an electric pressure test pump. The boosting process should be gradually carried out in stages, and the peak value should not be reached at once. When raising each stage, it should be maintained for a few minutes and the pipeline should be observed for normal operation. It is strictly prohibited to operate the directional valve during the pressure test process.

5. No load debugging

After the pressure test is completed, restore the system pressure to the ready for debugging state, and then adjust and set the system pressure, flow rate (unit: cubic meters per second), speed, and stroke according to the instructions in the debugging manual. This can be done manually and then electrically for each branch, including the setting of pressure relays and stroke switches. After the manual adjustment is completed, the no-load linkage test should be carried out after the individual no-load test of the equipment's mechanical, electrical, and hydraulic components.

6. Load test

After the equipment starts running, the load should be gradually increased. If the situation is normal, load testing can be carried out. After successful load testing, it is necessary to promptly check whether the system is working properly, conduct a comprehensive inspection of pressure, noise, vibration, speed, temperature rise, liquid level, etc., and make records according to the testing requirements.

{25}

Links

国产精品成人a区久久久 | 免费黄色视频大全 | 免费一级婬片A片AAA毛片肥女 | 美女免费成人Av | 香蕉视频免费在线观看,高潮毛片无遮 | 嗷嗷嗷嗷视频在线免费观看 | 在线观看中文AV | 黄色免费在线观看视频 | 凹凸日日摸日日碰夜夜爽孕妇 | 911亚洲精品无码成人A片在线 | 免费观看黄色视频网络 | 肉体呻吟高潮A片免费观看 强伦人妻一区二区三区电影 | 免费无码婬片AAAA片直播黑人 | 久久亚洲国产成人无码精品区 | 国产乱子伦无码吃瓜51 | 日韩一区二区三区无码人妻神宫 | 亚洲高清视频色视频 | 国产一级免费观看视频 | 26uuu欧美亚洲日韩偷拍 | 专干厂老熟妇视频二区七区 | 亚洲东京热一本在线看 | 99久久人妻无码精品系列涩谷 | 91精品国产综合久久久老牛影视 | 日日夜夜免费精品视频 | 亚洲AV激情一区二区三区 | 国产精品免费永久 | 手机在线一区二区三区四区视频 | 精品国产91久久久久久暴行片 | 理伦无码免费精品A片一区 一区二区三区在线观看高清 | www.17c.com日本无玛 | 国产富婆按摩对白一区 | 在线国产精品电影网 | 17C丨国产丨精品永久入口 | 人体内射精一区二区三区 | 国产熟妇无码A片AAA毛片视频 | xxxx69在线免费观看 | 寡妇高潮一级毛片在线播放一 | 91精品国产综合久久久果冻传媒 | 中文字幕在线免费看线人 | 中文字幕成人二区在线 | 国产无码一二三区 |