性欧美极品另类-性欧美极品-性欧美黑人xxxx-性欧美黑人-久久在精品线影院精品国产-久久曰视频

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Usage and installation steps of hydraulic lifting platform

Source: Time:2020-03-14 09:02:33 views:

Usage and installation steps of hydraulic lifting platform

The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

6、 Installation completed:

(1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

(2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

(3) Personnel and equipment exit the site.

{10}

Links

巨爆乳少妇无码一区二区毛片 | 免费无码婬片AAAA片小说直播 | 日本理伦片午夜理伦片 | 日韩高清无码二区 | 后入中出内射成人在线网站 | 青椒一区二区三区精品视频 | 亚洲国产综合久久 | 亚洲AV无码精品国产成人合集 | 黄色成人网站在线观看 | 性欧美婬妇ⅹXXX视频 | 秘书人妻91久久汗水 | 99久久精品免费看国产免费粉嫩 | 国产精品久久AV无码 | 无码人妻久久久久一区二区三区 | 2019日本不卡二区最新视频 | 操逼视频免费看蜜桃臀 | 国产一级特黄高清在线大片 | 蜜芽青娱乐亚洲精品网 | 亚洲亚洲人成综合网络 | 蜜桃av鲁一鲁一鲁一鲁樱花影院 | 黄色仓库美女诱人在线观看视频 | 中文字幕在线观看网 | 一区二区三区四区日本 | 精品夫妻一区二区三区天堂 | 午夜伦伦电影理论片A片在线 | av免费观看网站在线观看 | 国产h片一区二区在线免费看 | 一本一级A片视频 | 24小时在线成人免费视频在线观看 | 国产在线一区二区 | 人妻熟女近親相姦単体作品中出し | 国产女人18毛片水真多18精品 | 波多野结衣黄色视频 | 久久久精品理论A级A片 | 欧美黑人性爱大片 | 国产无套粉嫩白浆内射思欲 | 国产免费一区二区三区三州老师 | 一级做a爰片久久毛片A片换脸 | 东方欧美亚洲色图 | 日韩av在线小说 | 69精品一区二区三区无码吞精 |